Written, itemised price before a single wire is touched · (000) 000-0000

Electrician Kenmore WA
Newly finished kitchen with white cabinets and under-cabinet lighting

Electrical Remodels

Electrical Remodels in Kenmore

New circuits for the kitchen, bath or addition, laid out before the walls close and signed off before they do.

Plan my remodel wiring — (000) 000-0000

Get the Wiring Right While the Walls Are Open

Open studs make electrical changes cheap. Once drywall, tile and cabinets go in, the same change means cutting, patching and repainting. That is why the wiring plan belongs at the start of a remodel, not the end.

We sit down with you, and your contractor if you have one, to count every new load: induction range, wall oven, heated floor, island outlets, under-cabinet lights. Then we check the panel can carry them, draw up the circuit layout and price rough-in and finish separately so you can see exactly where the money goes.

Working without a general contractor? That is fine too. We will tell you which inspections the remodel needs, when to book drywall around them and what has to be finished before the final, so you can sequence the trades with confidence.

Remodel Wiring, Item by Item

Everything electrical between demolition and the last cover plate.

Load count

Each new appliance and fixture added to your existing loads to confirm the panel can support the project.

Circuit layout

Receptacles, switches, lights and appliance circuits mapped room by room and agreed before rough-in.

Appliance circuits

Dedicated 120- and 240-volt circuits sized to the range, oven, dishwasher and other equipment you have picked.

Countertop and island power

Receptacles placed where code requires and where you will actually use them.

Bathroom protection

Ground-fault protected outlets, a properly sized fan circuit and vanity lighting placed for real use.

Basement and addition circuits

New branch circuits, lighting and smoke-alarm interconnection wiring as the plans call for.

Rough-in inspection

Boxes, cable and connections inspected before insulation, so nothing gets buried unchecked.

Finish and test

Devices and fixtures installed after paint, every circuit tested, every breaker labelled.

How the Remodel Runs

  1. Plan it

    We review drawings or walk the space, list the loads and check the panel. You get an itemised quote split into rough-in and finish.

  2. Rough it in

    When framing is done, we install boxes and cable and book the rough-in inspection. Walls close only after it passes.

  3. Finish it

    After paint we set devices and fixtures, test every circuit, book the final inspection and walk you through the panel.

Why Contractors and Owners Use Us

Panel checked on day one

No finding out the service is too small after the cabinets arrive.

We work to the schedule

Rough-in and inspections are booked ahead so other trades are never stuck.

Written plan for everyone

One circuit layout that the owner, designer and builder all work from.

  • Load countedBefore rough-in.
  • Two inspectionsRough-in and final.
  • Itemised priceRough-in and finish split.
  • Panel labelledEvery new circuit.

Remodel on the Calendar?

Call while the plans are still drafts. A free visit now heads off change orders later.

Start the wiring plan — (000) 000-0000