New Construction Wiring in Kenmore

One electrical partner for the whole build, from the service size on paper to the final inspection.

Talk through my build — (000) 000-0000

Do It Once, Do It Right

A new build is the one chance to put every circuit exactly where it belongs. Decisions about amperage, future chargers and how the lights are switched are also cheapest at this stage.

Our new-build work covers fresh houses, ADUs and big additions, for owner-builders and general contractors alike. The service is sized from a load calculation, the layout is agreed room by room, and future equipment, like a garage charger or a heat pump, gets its circuit or conduit now instead of a retrofit later.

Owner-builder rather than a general contractor? We can help you sequence the electrical inspections with framing, insulation and drywall, and flag the decisions that need to be made early, such as where the panel goes and how big the service needs to be.

The Package

Plans to final, with nothing left to chase.

Calculated service size

Panel and service sized for the house as designed, with sensible headroom.

Room-by-room layout

Outlets, switches, lights and appliance circuits agreed in writing before rough-in.

Temporary power

Construction power arranged early so the other trades can start on schedule.

Rough-in

Boxes, cable and low-voltage pathways installed once framing is ready, neatly secured.

Ready for later equipment

Circuits or conduit placed now for chargers and heat pumps you plan to add.

Lighting and switching

Fixture positions and switch locations planned around how each room will be used.

Staged inspections

Rough-in and final booked ahead so the build never stalls on the electrical.

Finish and records

Devices and fixtures set, circuits tested and a complete panel directory handed over.

Working Alongside Your Builder

  1. Review the plans

    We go through the drawings, run the load calculation and issue an itemised scope your contractor can schedule against.

  2. Rough-in and inspect

    Once framing is ready we rough in the house over a few days and call for inspection before insulation.

  3. Finish and final

    After paint, devices and fixtures go in, every circuit is energised and tested, and the final inspection is passed.

Why Builders Bring Us In

On site when framing is

Rough-in timed to the contractor's schedule, not squeezed between other jobs.

Future equipment planned

Charger and heat pump questions asked before the walls close, so the circuits are waiting when the equipment arrives.

Paperwork that adds up

Scope, load calculation and panel directory, all in writing and handed to the owner for the house records.

  • Service calculatedFor the design.
  • Inspections bookedAhead of time.
  • GC coordinationOn their timeline.
  • Full directoryAt handover.